It is imperative to work diligently on each project discipline to design ergonomic, aesthetic and human-focused structures that are compatible with the environment.
The harmony between the project disciplines and the ability of these different disciplines to complete each other correctly is the key to creating a comfortable and peaceful living space in the building.
In Project 106 offices, constructions are designed with the consciousness that they are human life oriented and the most important value of human life, not according to the minimum criteria of regulations.
It is one of our fundamental objectives to reflect the personality and identity of the architect and the user of a building with a work quality.
The structures of our architects are; passive energy systems. In this way, it is ensured that the operating costs are at the minimum value and the comfort is at the maximum value.
The details we have worked on during the projecting phase are prepared in the guideline for the manufacturing process. Our architects transform the project outputs into a piece of paper, making it a true reference source in the manufacturing process.
In addition to creating a consistent infrastructure for cost analysis with all these workloads, damage from problematic manufacturing is also reduced to minimum levels.
The designs we build provide quality of work and brand value and allow capital to be returned quickly for investors. In all our designs, salability and profitability levels are at the highest level.
With the creation of the ground survey reports; architectural, static, electrical and mechanical projects are prepared by the design team according to these priorities. Throughout the project design process, the construction group will intervene with the workings with certain periods, thus aiming for a healthier progress of the manufacturing process.
It is ensured that all the projects required for the building are maximized by establishing a single central den. In order to avoid problems related to manufacturing, the projects are reviewed by the design team concerned. Approved projects are delivered to the construction group, which will make the plans necessary for the manufacturing process.
Our project design team;
Soil survey reports,
Creation of drafts,
Preparation of the preliminary projects and submission to the municipality,
Decoration projects and detail drawings
With the approval of the project, 3d modeling and preparation of 3d models for product marketing,